Lecture 15, 30.01.2025 Additional test - retake test
You have to send the solution by 13:00.
Select the tool you find the best for solving the problem described below. Prepare calculations and the source file with your calculation upload as a solution (the calculation of the quantities must be described understandably).
You must order the materials for the 7-floor building (only the amount for reinforced concrete frame structure elements). Each floor is repeatable and consists of:
- 6 columns (rectangular cross-section, 0.3x0.3x4m)
- 1 slab (6x12x0.3m)
You need to calculate the volume of concrete as well as the necessary reinforcement and the total cost of the materials
Reinforcement for 1 column:
- 4 bars with a diameter of 20 mm and length 4.6 m
- 24 m of the bar with a diameter of 6 mm
Reinforcement for 1 slab :
- 60 bars with a diameter of 12 mm and length 6.6 m
- 30 bars with a diameter of 8 mm and length 12 m
- a ton of steel costs 6,000 PLN,
- the density of steel is 7 900 kg / m³
- the price of concrete is 500 PLN / m³